All Posts By

Tacrom Services

News

Rig Refurbishment

Increase of service capacity tacromGoal: Rig Refurbishment/Redesign Key Project HighlightsModification of the guyed wired, external supported Work over Rig to a freestanding self supporting entity, without losing original hook load capacity Project ScopeFull refurbishment and adaption of the footprint of four existing 15 year old 120t Work over Rigs (Cardwell KB 200C) to assure operations in a hilly off-road environment…
December 2, 2013
Uncategorized

Pilot Project

Tacrom Services S.R.L., a subsidiary of KATT GmbH, performed 8 hydraulic fracturing jobs between October 23rd and November 5th 2011 in N-E of Romania on a low permeability/depleated formation using Ultra Light Weight Proppant (ULWP) with 1.06 g/cm3 S.G..The jobs were part of a pilot project, evaluating the economics of fracturing in low permeability sandstone with low reservoir pressure. Treatments…
December 2, 2013
News

New Multi Purpose Pumping Unit (MPPU)

KATT GmbH mobilized a Multi Purpose Pumping Unit for the Service division Tacrom Service S.R.L: in Romania. The increasing demand for stimulation of existing production wells due to acidizing operations, forced KATT GmbH to design a new type of pumping unit. Technical Data: Pump: Triplex Pump, 3 1/2″ plunger, 600 HP Engine: Diesel Engine, 430 kW/2.200 rpm Transmission: Allison 6000…
November 11, 2013
News

TACROM Fracturing Campaign in Turkey

In the last years, the increasing requirement for natural gas in all the countries, especially those without natural gas resources, led to new research to extract gas from unconventional resources. One of this is gas production from coal bed methane (CBM). Commercial coal bed methane development is currently at the beginning in Turkey. Often the challenge to commercial development of…
November 11, 2013