Pilot project in Turkmenistan

December 2, 2013

Starting in March 2012 Tacrom Services mobilised it’s frac fleet to Turkmenistan where a pilot project, consisting in 4 hydraulic fracs, was performed.
Using water based, delayed cross-linked fluids, an average of 40 tonnes of ceramic proppant was placed on each treatment.
These were the first hydraulic fracs performed in Turkmenistan.
ppt-1
Even though the wells were over 3500m, our completion partners and employees were able to provide a custom-made service.
All four jobs ware a success in technical, HSE and post treatment production terms, with good chances for the project to carry on with another 10 jobs.
ppt-2